Framing on April 5 -- new #8 is
in the background.
Inside on April 14. The area back
on the left where the ladder is will be storage and utilities. The restrooms will be back to the right. All of
the peaked ceiling area is the main room.
Exterior on April 14
Lifting the upper wall panel into
place. It's a good thing that Dennis took pictures!
Ralph has been a fan of timber
frames for a long time, and he finally got his chance to have one built here.